During our first edit week, alot of major ground work had to be done by our group to get the post-production of our project off to a good start. This meant that in actuality, this was probably the busiest week of the project as we had an intensive editing week followed by a back-up shoot on Sunday. It was important to the group to simply put as much time as possible into the edit and get as much: shot renaming, take selecting and clip cutting done as possible this week and so our editing timetable was practically filled from 8am in the morning, til up to 5pm in the afternoon. During this time, we also trialed many different styles of titling and produced many test titles to try out in our sequence and see what we liked most. These titles were produced on a Macbook in LiveType, using the fonts such as "A Song for Jennifer" or "Briasco Rustic" which both had a distinctly handmade feel about them.
Edit Week 1 Schedule
Looking back on the week, I am very proud of our group as the work we did here really helped us get on with fine tuning the project the following week. However, I personally think that it would have been useful for us to not have more than 3 people booked to a session, as only really 2 people can work at one time on the edit suite and only 1 person could really work on titles. Therefore, if we had 4 people booked for a session, normally one member of the group would be left out, feeling as if they weren't contributing much to the session and their time could be far better spent.
No comments:
Post a Comment